Location:
Tyler St, Pittsfield, Massachusetts
Size:
NA
Time Frame:
1 Months
Completion Date:
October 2019
Details:
After a serious fire, we removed the existing 3rd floor - reframed and roofed the apartment building.
Tyler St, Pittsfield, Massachusetts
NA
1 Months
October 2019
After a serious fire, we removed the existing 3rd floor - reframed and roofed the apartment building.