Location:
Connecticut
Size:
NA
Time Frame:
3 Months
Completion Date:
October 2014
Details:
A window installation project in the historic Hopson Building in Naugatuck Connecticut, this job entailed the installation of 68 aluminum framed exterior with a primed wood interior Marvin windows in an existing office building on a busy main street while the offices were fully occupied. Using scissor lifts, man lifts, interior tents to control the dust and noise, we were able to complete the new construction window install in a few weeks without disturbing the office inhabitants.