Location:
Lennox, Massachusetts
Size:
NA
Time Frame:
3 Months
Completion Date:
November 2017
Details:
The project consisted of a large multi-purpose room (gymnasium), music room, and connecting area to the existing structure. The project while not very large in nature presented a challenge in the connection to the old school and also due to the very tall walls that needed to be framed out of 2x8 lumber. Both challenges were met by the TR Wells crew and the project was successfully completed during the early months of January 2018.